Notice of a Scheduled Full-Building Power Outage Due to a Legally Required Electrical Inspection (May)
[Notice of a Scheduled Full-Building Power Outage Due to a Legally Required Electrical Inspection]
Thank you for choosing HOTEL MYSTAYS PREMIER Narita.
We will conduct a legally required inspection of the electrical equipment on the dates and times below.
During this work, all electrical systems except fire safety equipment will be shut down.
We sincerely apologize for any inconvenience and appreciate your understanding and cooperation.
Thursday, May 7, 2026: Preparation from 23:00
Friday, May 8, 2026: 00:00–05:00
■Unavailable during the outage■
1 TV 2 In-room lighting 3 Refrigerator 4 Internet
5 Shower 6 Air conditioning 7 Telephone (internal/external lines) 8 Electric kettle
* Water in your Room will be available; however, hot water will not be available.
* FamilyMart will be closed from Thursday, May 7, 2026 at 21:00 to Friday, May 8, 2026 at 08:00.
* Elevators will not be available from 30 minutes before the outage starts until it ends (including both start and end), due to backup power switching operations.
* If you plan to check out early, please inform the front desk in advance (extension No.2).

















